I really have to throw some serious hours at this build soon as I am falling further and further behind schedule. I have only managed about 100 hours in 3 months when I really ought to be getting 100 hours a month if this boat is to be finished in 2011. I have already conceded to myself this is looking highly unlikely now but I will keep at it, perhaps as I get all the construction work finished and am down to the shining and polishing work things may accelerate. This month I hope to have the bathroom furniture finished. I have more polycore so have all the material I need to get it done except for the actual fittings, ie sink, taps, another toilet etc. As I did last month, I have updated to this month but there are also some more logs detailed for March and some pictures on mounting the black water tank, so go back to March if interested.