The last of the hull construction is the strengthening uni ropes in the tops of the 4 spanning bulkheads, (I also still have a uni stack on the front of the front bulkhead to do) and then the external furniture which also acts as part of the bulkhead structural strength. From then on I have internal furniture and fittings (plumbing and electrical). I will start on some of the top half of the boat soon too, with the hull to deck strip planking.
You May Also Like
Previous Post
Back from Holidays to near disaster. Next Post
Pure Seal 9 months test