Inside Port bow planking bogged, foredeck planking started

Posted by Paul

I have started on the foredeck planking. Even though I have not yet sanded and glassed the inside of the inside bow panels, I figure they are not going to change shape so I can safely make the foredeck panel and sand and glass them later. The foredeck planking buts neatly between the 2 inside hull panels and the panel must be made with the joins in mind. The angle that is made at the ends must be uniform and the same each side.

Jo and I are thrilled with the progress of our boat. We also thoroughly enjoy logging it on this site and enjoy the emails we get from readers. Thank you all for reading this year, we hope you have a happy and safe New Year celebration and that in 2008 you achieve all that you set out to do.

Time Spent: 64.00 Hours

Total build time so far: 1282.00 Hours

Total Elapsed Time: 2 Years 3 Months 4 weeks