Whilst all this was going on, Dean started some rough work (I dont mean rough as in quality, I mean rough as in initial) work on the shaping of the bows.
In the next week the rudders and the glass toilet that Mike in Perth (also building a bi-rig cat and doing a great job, we are in a race to launch and I am losing!) had made for me. He is using the same and also the mast posts and masts. But we have quite different layouts so its interesting seeing the different approaches we are taking to the same design. But the toilet is needed to finish this bathroom and the rudders are needed for the next stage, finally finishing the rear steps and getting them into the boat. Once in with the noses shaped and glassed and the rear steps in, the boat is ready for a massive coat of bog, just so nearly all of it can be sanded off again. But man, will it change in appearance once faired.
Time Spent: 125.00 Hours
Total build time so far: 3824.00 Hours
Total Elapsed Time: 5 Years 11 months, 3 weeks